Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

swissporPIR Alu edges: square, rebated or tongue and groove?

PIR insulation

At a glance

When choosing swissporPIR Alu, look at a section through two joined boards. FIT/GK has square edges, LAP/SF forms a rebated joint, and a TAG/NuF tongue fits into the neighbouring groove. The difference matters in the last row: trimming a board against a wall can remove the factory edge you need for the next joint. Check the laying direction, cuts and coverage before ordering. A shaped edge helps the boards fit together; the design must still provide support and waterproofing.

Tongue-and-groove edge and aluminium facing of swissporPIR Alu

Read the edge code on the pack

Sketch the butt joint, step or tongue and groove on the order drawing. Resolve any difference between sketch and pack label before laying out the boards.

What the conductivity figure leaves out

The declared core conductivity is 0.022 W/(m·K). It describes heat conduction through the material, not heat passing beside a poorly fitting edge.

Inspect the underside of a trial joint as well. A rebate can look closed from above while a damaged section prevents the boards from sitting level.

Where to put a cut edge

Mark the wall side on the board face before cutting. Keep the factory profile on the side facing the next course where the layout calls for it.

Brush off loose particles and trial-fit without forcing the piece. A cut joint beside a service penetration must follow that penetration detail.

Offset joints between layers

Use different colours for the joints in the two layers. Mark the shorter starter board that moves the upper joint clear of the lower one.

Between closely spaced openings, check the stagger against site dimensions. A diagram of a typical bay does not locate the last cut piece.

Support beneath the joint

The tongue guides the row; it does not turn PIR insulation into a structural member spanning a void. Support is determined by the build-up.

If the joint moves during a trial fit, inspect the substrate and edge. Hammering the tongue home can hide the cause and damage the profile.

Specify the edge in the quotation

Compare quotations for the same profile and net coverage. A pack count without a working dimension says little about how many rows can be completed.

Confirm availability of the specified edge at the chosen thickness. If a square edge is proposed instead, revise the joint layout first.

A delivery check with two boards

Take two undamaged edges from a pack marked TAG/NuF and fit them together. If two steps overlap instead of a tongue entering a groove, hold that row and check the delivery against the order.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide