When should you choose an integrated solar roof for a new house?

Roofing and energy

At a glance

Choose a building-integrated photovoltaic roof before the structure and roof details are finalised. At that stage the covering, active area and electrical system can be planned together. A later switch may still be feasible, but involves checking parts already designed or built. BIPV serves as both roofing and an electrical installation. Start with the shape of the house, roof orientation and major sources of shade. A simple roof makes active panels easier to arrange, although other shapes can work. Tell the designer early so roof windows, chimneys and the desired appearance can all be reconciled with the system.

Graphite integrated PV covering on a pitched roof

What can you settle when choosing the house design?

There is no need for every part number yet. Decide the roofing principle and approximate capacity range. Steel roofing with integrated cells needs different detailing from separate modules above roof tiles. An early choice reduces later revisions to cost and appearance.

Why does the structural designer need a specific system?

Give the engineer the covering’s mass, support layout and fixing details. Snow, wind and building geometry also enter the assessment. A steel-based active element incorporates cells and glass, and its instructions may require additional layers. Ordinary lightweight sheet data are insufficient.

If the roof frame is already in place, check it against the selected product. Supports or junctions may need adjustment. Resolve differences before delivery to avoid fitting a system to a structure prepared on incompatible assumptions.

When should roof windows and penetrations be positioned?

Agree openings before ordering the active panels. A cell-bearing module cannot be cut to fit like a plain metal sheet. Use system details, often with passive pieces, around obstructions. Moving an opening by a few centimetres can alter the entire panel layout.

The roof also has to provide daylight, ventilation and safe access. Retain necessary windows and hatches. Draw the active area, openings and service zones on one plan before individual trades order materials.

What needs planning before the interior is finished?

Decide cable routes and locations for the inverter and any battery before closing walls and the loft lining. This allows deliberate penetrations and service access. Electrical design determines the equipment, including compliance with each manufacturer’s installation conditions.

An empty conduit alone settles little. Agree its route, contents and protection with the electrician. A coordinated route keeps services accessible and helps maintain the airtight layer through the junctions.

When should you order and book the trades?

Order from an approved layout and verified dimensions. The built roof may differ from a standard house drawing. Agree who takes the measurements and prepares the schedule of active panels, passive pieces and flashings before manufacture or picking.

Select contractors while refining the design. The project needs roofing and electrical skills plus familiarity with the system. Mark the points where both trades must attend so the roof need not be reopened for missed work.

What if the decision comes late?

Collect as-built drawings, measurements, photographs and details of the underlay. Ask the designer and supplier to assess the selected system against them. Establish the cost and extent of changes before relying on a general assurance that the roof can be converted.

Sometimes a small adjustment is enough. Elsewhere another system makes more sense. Compare options before buying. Choosing BIPV early lets the roof and energy system develop together, whereas a late change needs a detailed check against the building as completed.

Before ordering, establish the date after which moving a roof window requires a new active-panel layout. Record it alongside the as-built survey and panel schedule sign-off. Everyone can then see when a design change starts affecting production.

Names in the integrated solar roofing market include Ennogie, ML System, SoliTek, Megasol Energie, Electrotile, EDILIANS, SolRoof, Wienerberger Wevolt, MDM NT (MyRoof) and SunRoof.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide