Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

Where does termPIR AL fit in a house?

PIR insulation

At a glance

termPIR AL is a rigid PIR board faced on both sides with a gas-tight laminate containing aluminium, paper and polyethylene. The same product name on a roof, wall or floor quote does not mean the installation is the same. Start with a section through the tightest detail, such as an existing low door threshold. Measure the depth available for all layers and show where floor insulation meets wall insulation. The board must help meet the thermal requirement without raising the floor into the doorway or leaving an exposed strip at the junction.

termPIR AL insulation board showing its PIR core and facing

Choose for the actual installation

Measure between substrate and finished floor at the doorway. Subtract the other layers and compare the remaining depth with the resistance required by the design. That section shows whether termPIR AL solves the threshold problem.

Arrange to see a joint and its wall termination before covering. This allows the owner and site supervisor to inspect board fit at a useful stage, without relying on the appearance of the finished floor.

Check the factory and cut edges

The three edge options are FIT (square), LAP (shiplap) and TAG (tongue and groove). Identify them from the edge section, not the laminate colour.

Set out the last row back from the wall. Note its width and which edge loses its profile when cut. Have the installer show how this joint will close on a supported base without wedging narrow strips in place.

Thickness and thermal resistance

For termPIR AL from 20 to 250 mm thick, the manufacturer declares λD of 0.022 W/(m·K). To calculate layer resistance you also need thickness in metres.

For 100 mm, 0.100/0.022 gives about 4.55 m²K/W for the homogeneous layer. For finished roofs or walls ask for the complete assembly U-value; corners and fixings need to be accounted for in the design.

Protect the control layers

The intact laminate strongly resists vapour passage. At a cut, joint or cable hole, continuity depends on the detail rather than the factory facing alone.

Before covering, photograph the pipe or cable and surrounding board. Inspect the substrate and connection to the designed vapour control layer. An intact board face elsewhere does not seal the penetration.

Loading and fire classification

Read two separate entries for AL: CS(10/Y)120 means at least 120 kPa in the 10% deformation test; reaction to fire of the board is F at 20–49 mm and E at 50–250 mm.

For a heavy cabinet or appliance, give the designer its bearing area and load duration. Do not treat 120 kPa as an allowable finished-floor pressure. Keep the load-distributing layer design for future equipment changes.

Compare complete orders

Nominal formats of 600 × 1,200 and 1,200 × 2,400 mm do not necessarily equal the cover size after jointing. Give the application, thickness and edge type as well as the format.

At changes in plan, count full boards and mark offcuts reusable in the next row. Larger boards reduce joints but are harder to handle through narrow openings. Itemise reusable cuts and perimeter materials in the quote.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide