Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

BauderPIR M and MF: how to read a roof insulation quote

PIR insulation

At a glance

If a roofing quote says only “BauderPIR 100 mm”, ask whether the product is M or MF and request an edge drawing. Both boards have mineral fleece facings on each side, but the edge profile affects the joint layout. For a bonded roof covering, the fleece, adhesive and waterproofing must also suit the proposed system. Before comparing prices, look up the declared thermal resistance for the quoted thickness. Check the roof covering instructions for the required surface preparation and bonding method.

BauderPIR board with mineral fleece facing and exposed cream PIR core

What to settle before delivery

State the board designation, thickness and edge type on the order. If the supplier proposes a substitute, give the roofer the new facing specification and the exact adhesive specified for the roof covering.

Identifying the board and its declared properties

The M/MF range has a 1200 × 600 mm format. The Polish M sheet gives λD 0.026 W/(m·K) for thicknesses from 80 mm up to but excluding 120 mm, a compression value of at least 120 kPa and reaction to fire class E. Look up the relevant row for any other thickness.

Using a worked example

For a 100 mm M board, dividing 0.10 m by 0.026 W/(m·K) gives roughly 3.85 m²K/W. This illustrates the resistance of one layer. Also check the quote against the declared RD for that thickness.

The roof designer also accounts for the other layers and the fixing method when calculating whole-roof performance. Borrowing a conductivity of 0.022 from an aluminium-faced board would change the result even at the same thickness.

Comparing the available options

Draw two adjacent courses for each option, one layout for M and another for MF. Mark cut edges at the parapet and how the final course closes. This gives the roofer a basis for pricing labour for either edge profile.

Inspection before covering

At delivery, inspect the fleece on the underside as well as on top. Set aside wet boards or boards with detached facings for assessment. Before bonding, check the surface condition against the selected system instructions.

What the quote should cover

Compare quotes for the same roof area and bonding scope. Itemise insulation, substrate preparation, system adhesive and labour at flashings so the difference in cost per square metre can be traced.

Records to keep after completion

Keep the pack label showing M or MF, the sheet for the installed thickness and the name of the adhesive actually used. A photograph of the first joined boards records the joints before concealment.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide