BauderPIR FA-TE beneath a terrace: door thresholds, pedestal loads and waterproofing

PIR insulation

At a glance

To assess BauderPIR FA-TE for a terrace above a heated room, draw a section from the door threshold to the outlet. Allow space for insulation, waterproofing, pedestals and paving. Water running beneath the paving needs a clear path to the outlet, including at the door. Mark the foot of the nearest pedestal on the same drawing. Its position affects how the waterproofing must be protected. Before ordering, establish the threshold and outlet levels, the pedestal detail and the effective cover dimensions of the FA-TE boards being supplied.

Small aluminium-faced BauderPIR FA-TE boards with straight edges

What to settle before delivery

Measure the top of the structure, the proposed paving level and the waterproofing connection to the frame from the same datum. Have the door installer and terrace contractor agree this junction on one drawing.

Identifying the board and its declared properties

FA-TE has aluminium facings on both sides. The stated board properties are λD 0.022 W/(m·K), CS(10/Y)120 and reaction to fire class E. Assess the pressure from each pedestal separately, taking account of its base and the intervening layers.

Using a worked example

The 1200 × 600 mm overall dimensions give 0.72 m² per board, or 7.20 m² for ten boards measured edge to edge. The Polish data sheet also lists installed dimensions of 1185 × 585 mm. If these apply to the delivery, use them for the cutting plan.

UK documentation describes a square-edged version, while the rebated variant may be designated FA TE F. Ask the supplier for an edge profile and confirmation of effective cover against the exact product label.

Comparing the available options

If headroom at the door is tight, compare sections showing thermal performance, waterproofing continuity and drainage together. Moving a pedestal may clear a flashing, provided its new spacing suits the paving system.

Inspection before covering

Before the final row of paving goes down, inspect the supports at the door, the waterproofing termination and access to the outlet. Check that the slab above the outlet can be lifted for cleaning.

What the quote should cover

Price boards by effective cover and list cuts at the jambs, drainage components and protection under the pedestal feet. State which contractor is responsible for the connection to the door.

Records to keep after completion

File a photograph of the exposed threshold with a scale, the outlet position and instructions for lifting the paving. These records will help locate the waterproofing termination if the door is replaced.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide