Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

IKO enertherm MG and foil-faced PIR under a synthetic roof membrane

PIR insulation

At a glance

If a roof quote replaces foil-faced PIR with IKO enertherm MG, ask for a revised section and membrane fixing instructions. MG has coated glass fleece on both faces. The change of facing affects the connection to the covering. The thermal calculation also changes because MG conductivity varies with thickness. Compare the quotations once both state the thickness, declared RD and method of securing each layer. Pay particular attention to details where thicker insulation leaves less height for the membrane upstand.

IKO enertherm MG with a matt glass fleece facing and exposed PIR core

What to settle before delivery

Record the full membrane designation and identify what secures it. Bonding requires an adhesive compatible with both contact surfaces. Mechanical fixing requires suitable anchorage in the substrate.

Identifying the board and its declared properties

MG’s PIR core is faced with perforated coated glass fleece. Its λD is 0.026 W/(m·K) below 120 mm and 0.025 from 120 mm. The declared compression value is at least 150 kPa and the board has reaction to fire class E.

Using a worked example

Compare the two MG data sheet rows. Declared RD is 3.80 m²K/W at 100 mm and 4.80 m²K/W at 120 mm. The extra 20 mm crosses the boundary between the two conductivity ranges.

Redraw the rooflight kerb if the thickness changes. With an unchanged kerb, the higher roof surface leaves less room for the vertical waterproofing upstand.

Comparing the available options

Request two complete roof options at the same thermal target. Include flashing heights and the fixing specification for the proposed membrane in each.

Inspection before covering

Before laying the membrane, check that the fleece is dry and firmly attached to the core. Mark boards with damaged facings for a repair or replacement decision before covering.

What the quote should cover

Itemise surface preparation, any separation layer required by the system and perimeter fixings. This shows the cost implications of changing the facing.

Records to keep after completion

File the MG label with the membrane designation and instructions for the fixing method actually used. Add photographs of a perimeter junction before the closing layer goes on.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide