Choosing Kingspan insulation for a house: identify the board before comparing prices
PIR insulation
If a contractor offers a “Kingspan board or equivalent”, start by asking for the full product name and its intended position. Therma is a PIR insulation range, Kooltherm has a phenolic core, and sandwich panels with structural facings perform a different job again. Even two Therma roofing boards of equal thickness need not have the same thermal resistance or facing. TR26 and TR27 illustrate how to check what a substitution would mean for roof height, attachment of the waterproofing and the installed price.

Identify the role of the product
Read the drawings to see whether the insulation rests on a loadbearing deck or whether the ordered component must span between supports. That distinction determines which product families to consider.
Have the model code entered on the order and match it to the delivery label. In the event of a claim, “Kingspan, 100 mm” will not even establish which facing was agreed.
Compare the board facings
TR26 uses an aluminium laminate; TR27 has a glass-fibre facing. Identify that surface before choosing how to attach the roof covering to the insulation.
If the quotation assumes bonding, check that the specific membrane and adhesive are approved for the proposed facing. Confirmation for the original board does not establish compatibility with the replacement.
Match the required thermal resistance
At 100 mm the catalogue gives TR26 a λD of 0.022 W/(m·K) and an RD of 4.50 m²K/W; for TR27 the respective figures are 0.027 and 3.70. Matching thicknesses would conceal a material difference in resistance.
At 120 mm, TR27 has an RD of 4.60 m²K/W. This is close to 100 mm TR26, but the extra 20 mm can change the height available for the rooflight flashing.
Check the revised roof section
Identify the support, insulation and water-shedding layer separately. An insulation board on a metal deck does not take over the role of an entire sandwich panel with two structural facings.
Before approving a substitute, trace the vapour control layer and waterproofing at the edge of the opening on the section drawing. Both still need workable connections after any change in build-up height.
Ask for the right test evidence
Reaction to fire describes the product’s behaviour; fire resistance applies to a specified assembly. If the project calls for the latter, ask for evidence covering the complete construction.
Likewise, compressive stress at 10% deformation does not specify an allowable permanent pressure. An equipment base also requires the duration and distribution of the load to be considered.
Calculate the cost of a substitution
Compare the model name, thickness, declared resistance, facing and data sheet date in both quotations. Each mismatch identifies a specific item to take back to the designer or supplier.
Include revised flashings, fasteners or adhesive wherever the alternative requires them. Add these items to the board price to see the actual cost of the substitution to the homeowner.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
When choosing flat roof waterproofing and insulation, confirm that the particular products work together, not simply that each is suitable in isolation.…
swissporPIR Alu is a PIR insulation board with a laminated facing. Its silver surface does not make it a self-supporting roof panel…
When choosing swissporPIR Alu, look at a section through two joined boards. FIT/GK has square edges, LAP/SF forms a rebated joint, and…
On IKO enertherm ALU TG boards, the tongue of one board fits into the groove of the next. Along a straight run…
Cost-effective insulation suits the way a building is used. An unheated garage has different needs from a workshop or a holiday cabin…
Renovation of a potato store before harvest must be planned from the conditions for receiving the first batch, not from the delivery…
Before installing equipment above BauderPIR FA, ask the designer to trace the load from each foot to the supporting structure. The share…
An energy-efficient house should allow seals to be repaired, drains to be inspected and installations to be serviced without unnecessarily dismantling large…