Planning a roof replacement: seven checkpoints from survey to handover
Plan a roof replacement around inspections of the structure, concealed layers, delivery and finished covering. This makes missing details easier to find before they disappear beneath the next layer. First establish the attic's intended use and arrange a survey of the existing roof. Those findings determine materials, repairs and the sequence of work. This guide covers measurements, unloading, weather protection during removal and handover records, including roofs that may contain asbestos. Budget for the complete assembly and allow for weather and defects exposed during stripping. A well-prepared order does not replace inspection, but gives the owner and contractor a shared checklist for each stage.