Eurothane Silver on a flat roof: specify thickness, edges and waterproofing
PIR insulation
Changing Eurothane Silver thickness can change more than the insulation value. The 20 mm version has different format options and compressive performance from thicker boards. Before accepting a substitute, match the label to the roof drawing: board size, edge, thickness and waterproofing attachment all matter. Check finished levels at the parapet and outlet. Matching conductivity alone does not show that the proposed alternative will fit the designed details.

Where the board fits in the project
Silver is a PIR board with gas-tight facings. Agree the deck, layers below the board and the specific membrane above it with the roofer.
A smaller board may be easier around multiple penetrations. In open areas, larger boards reduce joint count if access and handling permit.
Junctions worth checking
Catalogue sizes are 600 × 1200 and 2400 × 1200 mm. Only the former is listed at 20 mm; do not calculate that delivery on the larger module.
Specify the edge as well as dimensions. Changing from straight to rebated edges requires checking net cover and the position of the first row.
Reading the thermal figures
Silver has λD 0.022 W/(m·K) over 20–200 mm. Resistance of the insulation alone does not include fixings or perimeter thermal bridges.
At the outlet compare the required thickness with the flange level and roof fall. The insulation should not impede drainage at the lowest point.
Moisture and substrate condition
The gas-tight foil ends at each board edge. The design should show internal vapour control separately from external rain protection.
Follow both layers to their terminations at the parapet. A photo with a ruler at the insulation top helps compare the as-built level with the drawing.
Understanding load and fire ratings
The September 2026 sheet distinguishes CS120 at 20 mm from CS150 at 30 mm and above. It lists reaction-to-fire class F for the board from 30 mm, with no class stated at 20 mm.
If a quote cites B-s2,d0, obtain the conditions for the assessed end use on steel decking. It does not describe every Silver board or the fire resistance of every roof.
Quotation and handover
Separate insulation supply, membrane attachment and parapet flashings in the estimate. Otherwise it is hard to see whether the cheaper price includes the roof perimeter.
Keep a pack label showing size and thickness at delivery. Resolve discrepancies before opening packs, particularly if the layout was drawn for 20 mm boards.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
Rigid PIR insulation boards can be used in suitably designed roofs, walls and floors. Suitability depends on more than thickness and foam…
When renovating a pig house envelope, the choice of boards must be agreed with the cleaning method, the internal environment and the…
Thermano ETICS combines foil-faced PIR with 20 mm of external façade-grade EPS. The following system layers meet the EPS, not the foil…
For over-rafter Powerroof insulation, count boards by their covering dimensions, not their transport size. A 2400 × 1200 mm board covers 2380…
Check the base before the first structural insulated panel (SIP) arrives. Its position and level determine how the remaining walls, openings and…
In these products, fibreglass means a glass-reinforced plastic facing, often described as GRP. It may protect the room-facing side of a PIR…
Internal insulation in a 1990s house should start with an assessment of the existing wall, not a board order. The construction date…
Use the same roof drawing to prepare two cutting layouts for EFIGREEN ALU+ and ALU+ XL. Larger sheets reduce the joint count…