Thermano ETICS beneath render: which side receives the finish?
PIR insulation
Thermano ETICS combines foil-faced PIR with 20 mm of external façade-grade EPS. The following system layers meet the EPS, not the foil on the core. For a house project, check the total composite thickness, the resistance of that version and the specification for the complete render system. A section through a window is a good place to compare options: it shows the sill projection, the reveal and the detail that sheds water clear of the finished façade.

What exactly are you buying?
Agree on the specified mortar, mesh and finish. “Suitable for render” does not identify which components may be used with the board.
Inspect a sample edge showing both EPS and PIR. For a narrow reveal cut, ask how the exposed edge is finished rather than assuming it can be rendered directly.
Details to agree with the installer
The 600 × 1200 mm boards have BASIC edges. The listed 100–180 mm thicknesses refer to the whole panel, including the outer 20 mm of EPS.
Lay boards out on an elevation showing the windows. Ask the installer to identify the system detail for opening corners and reinforcement.
Reading the thermal figures
The 0.023 W/(m·K) conductivity is for PIR. Dividing the total ETICS thickness by it would wrongly treat the EPS as PIR as well.
Compare the manufacturer’s resistance R for the composite alongside the thickness available at the window reveal. Both figures matter to the choice.
Protecting the layers and their junctions
Check the sill projection from the finished render. Measuring from bare masonry ignores the added wall thickness.
Request separate drainage details at the plinth and top of the façade. The EPS provides a system substrate; it does not replace flashings.
What to check beyond conductivity
Reaction-to-fire class E describes the Thermano ETICS board. Consult system documentation where the requirement concerns the finished façade.
Do not substitute fixings, mortar or reinforcement without checking. A changed component can fall outside the assessed configuration.
Quotation and handover
State the full board name, total thickness and render system on the order. Measure wall areas separately from reveals and flashings.
Compare square-metre rates after adding sills, profiles and plinth work. Differences in these items can account for much of the price gap.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
Changing Eurothane Silver thickness can change more than the insulation value. The 20 mm version has different format options and compressive performance…
Above the rafters, Thermano Roof preserves headroom but raises the covering in relation to the eaves, chimney and roof windows. Before choosing…
PIR insulation is not invariably half as thick as EPS. The equivalent thickness depends on the thermal conductivity of both chosen products.…
When there is no room for external insulation, an internal lining may be considered. It requires assessment of moisture, junctions and the…
Before insulating a potato store, it is worth preparing a sketch of the chamber showing storage locations, ventilation ducts and any damage…
The combination of PIR with mineral wool, EPS or XPS should be assessed on the basis of the entire cross-section of the…
Start a Recticel Powerdeck F specification with the roof covering: identify the membrane, attachment method and substrate it requires. The board has…
If a contractor offers a “Kingspan board or equivalent”, start by asking for the full product name and its intended position. Therma…