Utherm Wall LE or Wall K Gyp: cavity insulation and internal lining

PIR insulation

At a glance

Before choosing a UNILIN wall board, mark its position on the section. Utherm Wall LE insulates a cavity wall. Wall K Gyp combines insulation with plasterboard on the room side. For cavity work, detail the wall ties, cavity and drainage at the foot of the wall. For internal lining, establish the existing wall condition, fixing method and joint finish. When comparing quotations, identify whether the thickness refers to PIR alone or the full composite. This dimension affects the depth of window and door reveals.

Utherm Wall LE cavity wall insulation and facing

Wall LE in a cavity wall

Draw the inner leaf, Wall LE and facing leaf in the cavity wall. Dimension the residual space required by the particular wall design.

Thermal performance at fields and junctions

Wall LE has declared λD of 0.022 W/(m·K) and compressive stress of at least 150 kPa at 10% deformation. These are properties of that board and do not describe the gypsum layer in a composite.

At the lintel, trace heat flow through the masonry and opening edge. Assessing this junction requires component dimensions and insulation continuity in the reveal.

Working around ties and uneven masonry

After the first course, check that boards sit against the prepared masonry. Projecting mortar can hold a rigid board away from the inner leaf.

Transfer tie positions to the board before cutting. Inspect each penetration while the facing leaf is still open and access is possible.

Moisture and drying paths

Water entering behind the facing leaf needs a designed route out. Inspect the base of the cavity and the head of each opening before further masonry conceals them.

For internal insulation of an existing wall, assess moisture and drying potential after installation. The laminate and plasterboard change the build-up on the heated side.

Fire and acoustic requirements

Wall LE has reaction to fire class E. Where the wall must meet a fire resistance requirement, ask for evidence covering the full construction, its layers and junctions.

Assess sound insulation for the complete wall, particularly the floor and return-wall junctions. Thermal conductivity data do not give an acoustic rating.

Comparing complete installation scopes

For Wall K Gyp, specify insulation and plasterboard thickness separately, with joint and corner finishing. For Wall LE, allow for cutting, ties and cavity details.

Schedule inspection before closing the cavity for Wall LE, or before joint filling for a composite lining. Agree which photographs will form part of the record.

Checking the finished reveal depth

When lining a room with an existing sill, check the reveal depth after adding Wall K Gyp. Measure space for sockets and skirting before accepting the price for the lining.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide