Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

Ordering IKO enertherm ALU TAP tapered roof boards by drainage area

PIR insulation

At a glance

Schedule IKO enertherm ALU TAP from the outlet towards the high edge of each drainage area. Two tapers can have the same gradient but different starting heights. Mark the sequence, drainage arrows and thicknesses where successive rows meet. A change in sequence can create a step in the water path even when the pallet holds the right number of boards. At delivery, match pack references to the layout. At inspection, check levels on both sides of the junction between drainage areas.

Square IKO enertherm ALU TAP tapered boards with aluminium facings

What to settle before delivery

Establish the level and catchment of each outlet. Plot rooflights and other obstructions that interrupt straight runs or change the direction of drainage.

Identifying the board and its declared properties

ALU TAP boards are 1200 × 1200 mm with square edges and aluminium laminate on both faces. Gradients include 0.83%, 1.25% and 1.67%. The sheet gives λD 0.022 W/(m·K), a compression value of at least 175 kPa and reaction to fire class E.

Using a worked example

Over a horizontal run of 1.20 m, a 1.25% gradient changes the height by 15 mm. Two runs in the same direction give 30 mm on a level deck with no step at the joint.

To use the example for ordering, enter the starting thickness at the outlet. The designer will also need the varying thickness across the area to assess the thermal performance of the roof.

Comparing the available options

For two outlets, list quantities separately for each catchment. If both use the same taper types, label the unloading location so one area does not receive the other’s allocation.

Inspection before covering

Dry-lay the first sequence and measure both ends of each taper. Trace the path from the junction to the outlet and record local rises before waterproofing.

What the quote should cover

Include the numbered taper layout, specified base boards and special perimeter cuts in the quote. Identify who revises the schedule if an outlet moves.

Records to keep after completion

Keep the final layout, pack references and measured outlet levels together. If a drainage issue arises, this lets you compare a particular board sequence with its designed fall.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide