Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

IKO enertherm KR ALU beneath underfloor heating: checks before screeding

PIR insulation

At a glance

IKO enertherm KR ALU forms an insulating layer below the heated screed. The printed grid helps the installer follow the pipe layout on the heating drawings. Before ordering, check the depth available at the door for insulation, pipes, screed and floor finish. Compare both sides of the threshold, particularly where tile meets timber. Before screeding, the board support, movement joints and actual pipe routes are still visible. Once the screed has set, reaching these details means opening the floor.

Printed grid on the aluminium facing of IKO enertherm KR ALU

What to settle before delivery

Measure from the highest point of the prepared base. Agree the position of the pipes within the screed with the heating contractor so their depth is counted only once.

Identifying the board and its declared properties

KR ALU has a gridded aluminium facing, λD of 0.022 W/(m·K), a compressive stress of at least 150 kPa at 10% deformation and reaction to fire class F.

Using a worked example

The KR ALU table gives declared RD values of 3.60 and 4.50 m²K/W for 80 and 100 mm respectively. The extra 20 mm therefore adds 0.90 m²K/W of resistance in the insulation layer.

Using nominal conductivity for 100 mm gives about 4.55 m²K/W. Compare quotations using the declared 4.50 and mark the finished floor level for each option.

Comparing the available options

If depth at the doorway is limited, work through alternatives with the floor designer. Show insulation thickness, specified pipe cover and the transition between finishes for each option.

Inspection before covering

Before pouring, inspect the manifold area and doorways. Compare pipe spacing with the drawings, check board support between service runs and record the circuit leak test result.

What the quote should cover

Price the KR ALU layer separately from the heating installation and screed. Define the base preparation and who forms the movement joint at the threshold.

Records to keep after completion

Attach photographs of the loops with dimensions from a permanent wall. Together with the manifold circuit labels, they help locate pipes during later work.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide