PIR insulation
When the exterior cannot change, termPIR AL GK combines rigid PIR insulation with a 12.5 mm plasterboard lining on the room side. The PIR layer has gas-tight facings on both sides. The composite can simplify installation, but the new gypsum surface will hide the old wall. Establish why the room feels cold, whether the masonry is damp and how corners and reveals will behave after insulation. Measure the space lost to the entire panel, not just its core. Also plan sockets, cupboard fixings and the route for bringing long boards into the room.

Start with the existing wall
Before choosing the composite, describe the masonry, its condition, room use and reveal clearance. The plasterboard provides a finishing surface but will hide moisture behind it.
Measure the route from unloading point to room, especially stair turns. An unplanned cut creates another joint to finish. Mark sockets and future fittings on the wall and agree a cutting plan before delivery.
Check handling and layout together
An AL GK panel is 2,600 mm long and 1,200 mm wide. At a suitable room height it can cover much of a wall without a horizontal joint, provided it can be carried in and turned upright.
Sketch the wall with doors and cable outlets. Before cutting a board for a tight corridor, check where the new seam will fall once installed. Agree panel lengths, cuts and handling space.
Separate core and panel thickness
The figure of 0.022 W/(m·K) describes the PIR part, not the foam and gypsum together. Divide the core’s own thickness by that conductivity when estimating its resistance.
Use total panel thickness when checking room width. For thermal assessment separate the PIR and 12.5 mm plasterboard or use the correct declared R. Using the whole dimension with the PIR lambda would exaggerate the benefit.
What happens to moisture in the masonry?
Internal insulation reduces heat supplied to the masonry. The colder wall may dry differently; covering it with plasterboard does not remove a moisture source.
Inspect the ceiling junction and any moisture marks. Establish their cause and the future drying path before enclosing the wall. Keep a condition record to distinguish pre-existing defects from later damage.
Fire classification and heavy fixings
Read B-s1,d0 within the specified end-use conditions for AL GK. It neither makes the core non-combustible nor gives the lining’s permissible load.
For a wall cabinet, mark the bracket and the substrate that will carry it behind the lining. Design the fixing through the full load path, not merely into the plasterboard. Keep the service drawing and fire classification separately.
Define a paint-ready finish
Request both core and overall composite thickness in the quote. Include installation materials, joint treatment and perimeter closures as well as panels.
Compare the paint-ready wall made with composite panels against separate layers. Include wall preparation, cuts at sockets, fixing and finishing all junctions in both. Bonding a board does not automatically include these tasks.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
A potato store log helps distinguish symptoms associated with a particular batch of crop from problems occurring in a specific part of…
Changing Eurothane Silver thickness can change more than the insulation value. The 20 mm version has different format options and compressive performance…
A roof over an enclosed, heated swimming pool must suit the actual moisture and chemical conditions inside. Insulation thickness or the label…
On a flat roof using SOPREMA EFYOS BLUE A, start at the tightest detail: what height remains at the parapet once insulation…
Before insulating a potato store, it is worth preparing a sketch of the chamber showing storage locations, ventilation ducts and any damage…
When damp repeatedly appears at home, gather organised observations before choosing a repair. A mark beside a window, a wet corner and…
Mark the intended insulation position on a section through the roof. Between uneven rafters, the material must fill each bay closely. Above…
Thermano GK-A and GK-H2 combine a PIR core with 12.5 mm plasterboard. White type A is for ordinary dry rooms; green H2…