Can termPIR ETX be rendered? Choosing insulation for a house façade
PIR insulation
termPIR ETX is a rigid PIR board with a gas-permeable glass-fleece facing, intended for two-layer walls in a compatible external thermal insulation composite system (ETICS). It is not a universal base for any render. Ask for the named system, suitable substrate, adhesive, fixings, reinforcement and corner details before ordering. A restricted window reveal is a useful test: show how the thinner insulation beside the frame joins the full wall thickness. Then check which conductivity applies at each thickness and confirm the production date before committing the scaffolding and installation crew.

What the façade quote should specify
Identify the named ETICS for this masonry and the fleece-faced ETX board in it. A narrow reveal is not grounds for substituting a similar board with a different facing. Ask to see the continuous insulation line at the frame.
Check the production date before booking the work. The installation instructions require a month between manufacture and installation. Delivery the day before work starts says nothing about whether that interval has elapsed.
Which side faces the wall?
Check the first row for the print facing the wall. Stagger the next row’s joints and keep all outer faces in one plane.
Record manufacture on the delivery note and mark laying direction and joint offsets on the elevation. The scaffold schedule does not shorten the one-month interval. Start bonding only once board age and substrate readiness are confirmed.
Use the conductivity for the actual thickness
ETX has three conductivity bands: 0.027 W/(m·K) below 80 mm; 0.026 from 80 to below 120 mm; and 0.025 from 120 to 250 mm. The 80 and 120 mm thresholds enter the next band.
Write down wall and reveal thicknesses side by side. Assign the correct lambda before calculating R. Using 0.025 for a thin reveal board would overstate its resistance.
Inspecting moisture and the bonding surface
Before adhesive is applied the wall should be dry, clean, level and sound. Inspect old coatings: flaking paint, detached render and efflorescence do not become sound substrates when concealed.
Mark questionable areas and record repairs. Remove weak material and determine why the wall is damp. A photograph and assessment of the prepared wall provide better evidence than a later photograph of smooth render.
Distinguish compression, fixing and fire performance
The ETX sheet specifies CS(10/Y)120. For the board’s reaction to fire, read the thickness band: F at 20–49 mm and E at 50–250 mm. These are independent properties.
At the corner, request the anchor layout for the masonry and façade load zone. CS determines neither anchor spacing nor fire performance of the complete ETICS. Keep the requirements for both anchors and reinforcement.
Price the complete rendered finish
Start the ETX layout with the nominal 600 × 1,200 mm format. Check cover size for profiled edges. Pair the resulting board quantity with components of the agreed façade system.
Complete the take-off at window corners, sills and the top edge. Include cuts, flashings, reinforcement, anchors and wall preparation. A board-bonding price alone omits the terminations that keep water from behind the façade.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
Renovation of a potato store before harvest must be planned from the conditions for receiving the first batch, not from the delivery…
On a flat roof using SOPREMA EFYOS BLUE A, start at the tightest detail: what height remains at the parapet once insulation…
A single window reveals much about how IDELCO α-therm WALL fits into a cavity wall. A section below the sill shows where…
Choose the wall finish before choosing PIR. A rendered external insulation system, a ventilated façade and a cavity wall use different interfaces…
An aerated concrete wall needs a compatible insulation system, not simply a product labelled PIR. A rendered façade requires the appropriate board…
Ask what will be finished when the crew leaves. A square metre of PIR does not include substrate preparation, fixings or sealed…
When specifying IDELCO α-therm ROOF, identify what secures the insulation to the deck and what holds the waterproofing in place. These two…
Start the delivery check before unpacking the pallet. Match the swissporPIR Alu labels to the order, count packs by thickness and record…