When does termPIR WS suit a flat roof?
PIR insulation
Choose termPIR WS together with the waterproofing and fixing method for the flat roof. The rigid PIR core is faced on both sides with gas-permeable glass fleece, not gas-tight aluminium laminate. What adheres to one surface may not suit the other. Ask for documented compatibility of the deck, board, bonding or fixing layer and covering. At the outset, agree how the insulation will be supported around outlets, how locally reduced thickness at a parapet will be assessed, and who will protect the exposed roof if work stops before the waterproofing is complete.

Specify the complete roof build-up
List the fleece-faced board, fixing layer and waterproofing in the enquiry. Request evidence for their combination before boards are spread over the roof. The core material does not determine surface adhesion.
Inspect the board joints and terminations on a garage roof before the final covering conceals them. Photograph the outlets and agree who keeps rain out during interruptions. An insulated deck is not yet a waterproof roof.
Detail the joints at outlets
WS is available with square or profiled edges. Check the label and confirm that neighbouring boards fit on a stable surface without lifting an edge.
Lay out the last row between the outlet and service enclosure. Mark support for each short piece and retain access to form the outlet flashing. A factory edge does not support a curved offcut.
Conductivity where the roof narrows
Read the WS thickness bands: λ is 0.027 W/(m·K) below 80 mm, 0.026 from 80 to under 120 mm and 0.025 from 120 to 250 mm.
At a low parapet mark the reduced thickness on the section and use the conductivity for that dimension. Neither the average roof depth nor the best value in the table describes this restriction.
Keeping the fleece dry
Include the open edge in the end-of-day weather check. Glass fleece does not shed rain like finished waterproofing; the roof covering remains a separate layer.
Direct runoff from temporary protection away from installed boards. After a break check dryness and fleece condition before laying the membrane. Record the condition at handover between trades.
Service traffic, equipment and fire
For WS, record CS(10/Y)120 and the board’s reaction to fire: F at 20–49 mm, E at 50–250 mm. These do not classify the roof assembly.
On the plan distinguish the maintenance route from a stationary equipment foot. Indicate protection and load distribution for each. CS120 does not give an allowable permanent pressure; assess fire requirements for the specified roof separately.
Compare installed roof prices
List format, thickness, edge and interface with the covering alongside WS on the order. Name the specific adhesive or fixing if the system requires one.
Compare only fixing methods suitable for the roof. Price boards by cover area, fasteners or adhesive, deck preparation, penetrations and perimeter work. The total should buy a closed roof, not insulation left exposed.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
If a roof quote replaces foil-faced PIR with IKO enertherm MG, ask for a revised section and membrane fixing instructions. MG has…
Before installing swissporPIR Alu on a flat roof, establish the deck, falls and fixing method. The manufacturer requires mechanical fixings even where…
White 100 mm PIR wall panels can suit many projects, but an outlet batch must be assessed individually. Documentation, joint and facing…
A SIP house kit may consist of uncut panels, numbered pieces machined to the design, or a supply-and-install package. Before comparing prices,…
On a terrace above a heated room, the door threshold alone does not determine how much PIR insulation will fit. The available…
Choose the wall finish before choosing PIR. A rendered external insulation system, a ventilated façade and a cavity wall use different interfaces…
Schedule IKO enertherm ALU TAP from the outlet towards the high edge of each drainage area. Two tapers can have the same…
An energy retrofit carried out in stages requires the junctions between works performed at different times to be designed. A roof renovated…