Kingspan Therma TR27 beneath a bonded roof membrane
PIR insulation
For a Therma TR27 roof, have the roofer name the membrane and adhesive in the quotation. The glass fleece facing is the contact surface for the next layer, so the bond must suit the particular system. Compare insulation thicknesses once the covering is defined. In the TR27 catalogue, both thermal resistance and declared conductivity vary. If a thicker board is selected, check the remaining room for membrane terminations at corners, parapets and flashings.

The two connections in the roof build-up
Show the attachment of TR27 to the deck separately from the attachment of the covering to the board. Specify each connection.
If a different adhesive is proposed, confirm compatibility with the fleece and membrane underside. Establish the permitted temperature and moisture conditions during application.
Inspecting edges and corners
Standard TR27 measures 1200 × 600 mm. The catalogue lists square and profiled edges. Check that the delivered edge matches the cutting layout.
Trial-fit the last board at a corner before bonding. It should sit steadily without lifting the edge below the future flashing junction.
Thickness-specific TR27 figures
The Polish catalogue lists λD 0.027 W/(m·K) and RD 3.70 m²K/W at 100 mm. At 120 mm it gives 0.026 W/(m·K) and 4.60 m²K/W respectively.
The difference between these entries is 0.90 m²K/W. Check this against the thermal target and the extra 20 mm of build-up at the flashings.
Surface condition before bonding
Before covering, inspect any surface showing signs of wetting or delamination. Use the selected system instructions to decide how to handle a damaged facing.
Where the system requires an adhesion check, record the location, conditions and result. This preserves evidence of the surface condition after the roof is closed.
Service loads and board properties
TR27 is declared at least 120 kPa at 10% deformation and has reaction to fire class E. Assess roof capacity and assembly fire classification separately.
For the maintenance route, specify traffic frequency and protection above the membrane. Foot traffic and a permanent machine support impose different loads.
Pricing a complete bonded roof
Compare roof costs at the same target U-value. List boards, adhesives, ancillary layers and substrate preparation labour individually.
If one quote covers only the field, add perimeters and corners using the same details as the second quote. This gives comparable completed roof costs.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
PIR insulated plasterboard combines thermal insulation with an internal wall lining in one product. Its suitability nevertheless depends on wall condition, thermal…
If a roof quote replaces foil-faced PIR with IKO enertherm MG, ask for a revised section and membrane fixing instructions. MG has…
When the exterior cannot change, termPIR AL GK combines rigid PIR insulation with a 12.5 mm plasterboard lining on the room side.…
When choosing swissporPIR Alu, look at a section through two joined boards. FIT/GK has square edges, LAP/SF forms a rebated joint, and…
A single window reveals much about how IDELCO α-therm WALL fits into a cavity wall. A section below the sill shows where…
Before installing equipment above BauderPIR FA, ask the designer to trace the load from each foot to the supporting structure. The share…
Above the rafters, Thermano Roof preserves headroom but raises the covering in relation to the eaves, chimney and roof windows. Before choosing…
On a terrace above a heated room, the door threshold alone does not determine how much PIR insulation will fit. The available…


















