What to inspect at handover of a power-generating roof
Handover of an integrated solar roof covers the roofing, electrical installation and records of how both were built. An app showing power generation confirms only part of the picture. Compare the installed roof with the approved design, the specific system manual and any agreed site changes. Bring inspection records from earlier stages to the final meeting, especially for layers and connections that are now concealed. List defects by location and agree who will correct them. Where the panel layout has changed, update the as-built drawing and monitoring map so the owner can identify the correct element when reporting a fault.