How city-wide energy retrofits start with individual buildings
A neighbourhood retrofit plan should show which building comes first, what work it needs and how the result will be measured. For each school, apartment block and commercial unit, collect energy use, opening hours and heating and ventilation records. Compare these with a roof and façade survey and with the cold or damp spots reported by occupants. This separates urgent repairs from energy-saving opportunities. At a low terrace threshold, a designer may consider PIR insulation while allowing room for drainage and waterproofing. Use a common approach to measurement and handover across the programme, and set the work sequence for each building.










