Planning building services before closing SIP walls

In a SIP house the structural wall and part of the insulation arrive together. This makes erection convenient but changes how services must be planned. Agree cable routes, pipework and ventilation openings before altering the prefabricated panels. A well-designed service void helps keep the polyurethane core continuous, limits penetrations and makes future alterations easier. SIP means structural insulated panel: facings and insulating core are bonded together. In a panel with OSB faces and PUR or PIR foam, the layers can act together to carry loads. Cutting or weakening them is a structural matter, not an ordinary adjustment to the finish.

By |2026-11-12T18:09:41+01:0012 November 2026|PIR boards and insulation|Comments Off on Planning building services before closing SIP walls

Delivering and storing SIPs on site

Schedule delivery of structural insulated panels (SIPs) for a time when the site is ready. Panels need suitable unloading equipment, level supports and protection from rain. Planning the laydown area reduces repeated handling and keeps panels accessible in erection order. This protects OSB faces, edges and the bond to the polyurethane core. Before dispatch, establish the vehicle type and largest panel dimensions. Check entrance width, turning space and the bearing capacity of the standing area. Overhead wires, trees and other obstructions can limit the unloading equipment's working space even when the truck itself can get in.

By |2026-11-12T18:09:40+01:0012 November 2026|PIR boards and insulation|Comments Off on Delivering and storing SIPs on site

SIP openings and joints: decisions to make before manufacture

A factory-cut window opening saves site work only if the window size and position are agreed in time. Cutting an opening changes how a structural insulated panel carries load, and its edges must provide for fixing and sealing the frame. Corners and panel joints need the same attention: they bring structure, insulation and rain protection together. A SIP consists of facings bonded to an insulating core. In panels with OSB skins and a PUR or PIR core, the skins and foam act together. The fabrication drawings need to show how that assembly works around every opening.

By |2026-11-12T18:09:39+01:0012 November 2026|PIR boards and insulation|Comments Off on SIP openings and joints: decisions to make before manufacture

Preparing the base for SIP walls: checks before installation

Check the base before the first structural insulated panel (SIP) arrives. Its position and level determine how the remaining walls, openings and corners line up. A polyurethane core and accurate factory dimensions are useful only if the panels fit the structure actually built. Complete the survey and agree any corrections before the delivery and installation crew arrive. A SIP building may stand on several types of foundation or a designed floor structure. The choice depends on the design and ground conditions. Lightweight walls still require checks on settlement, soil bearing capacity and the forces transferred to the base.

By |2026-11-12T18:09:38+01:0012 November 2026|PIR boards and insulation|Comments Off on Preparing the base for SIP walls: checks before installation

What should a SIP house panel kit include?

A SIP house kit may consist of uncut panels, numbered pieces machined to the design, or a supply-and-install package. Before comparing prices, ask for panel layout drawings and an itemised list covering core, facings, openings, edge machining, connectors and seals. Establish who handles transport, unloading, erection and finishes. SIP stands for structural insulated panel, but the name alone does not establish a specific product’s load-bearing role. For polyurethane insulation, confirm whether the core is PUR or PIR and how the design uses the panel.

By |2026-11-12T17:47:42+01:0012 November 2026|PIR boards and insulation|Comments Off on What should a SIP house panel kit include?

What to inspect when signing off EPS insulation

Inspect EPS insulation before each layer is covered. Compare the design and order with the board labels, checking application, thickness and properties for the facade, floor, roof or foundation. On a facade, inspect bonding during fitting and mesh overlaps and opening reinforcement before rendering. At foundations, check waterproofing before backfilling. Record each defect’s location, the repair and the reinspection date. Finished render, a thermal image or a matching trade name on an invoice cannot confirm the quality of concealed work.

By |2026-11-12T17:47:41+01:0012 November 2026|PIR boards and insulation|Comments Off on What to inspect when signing off EPS insulation

How to lay EPS roof boards without damaging the insulation

Before laying EPS on a roof, check the specified layer sequence, positions of vapour control and waterproofing, and direction of drainage. A board labelled for roofs and floors must still suit the support, fixing method, loads and moisture exposure of this roof. Plan deliveries, access routes and storage to avoid overloading the deck or damaging EPS under point loads. Before covering it, inspect cut pieces, wall insulation junctions and falls at outlets. Inspection of the insulation and testing the completed waterproofing are separate stages.

By |2026-11-12T17:47:39+01:0012 November 2026|PIR boards and insulation|Comments Off on How to lay EPS roof boards without damaging the insulation

How to protect foundation EPS before backfilling

Before backfilling a foundation, check the continuity of the waterproofing, the bond of the EPS boards and their protection against mechanical damage separately. Inspect corners, footing and plinth junctions, and every wall penetration. Photograph them with a scale and mark service routes. A dimpled sheet does not replace waterproofing, and a cavity behind a protective layer does not itself drain water. Match filling and compaction to the design, soil and wall capacity. Even a small repair may require excavation once the ground is levelled.

By |2026-11-12T17:47:38+01:0012 November 2026|PIR boards and insulation|Comments Off on How to protect foundation EPS before backfilling

How to lay floor EPS insulation in two layers

Two layers of floor-grade EPS let you offset joints, accommodate some services and fit the available floor depth. At the same conductivity and total thickness, dividing the insulation does not increase thermal resistance. Two 10 cm boards with a conductivity of 0.036 W/(m·K) give about 5.56 m²·K/W together. That figure does not imply greater load capacity or better impact sound insulation. Check support under both layers, long-term deformation and the compatibility of any acoustic layer with the floor design.

By |2026-11-12T17:47:37+01:0012 November 2026|PIR boards and insulation|Comments Off on How to lay floor EPS insulation in two layers

Fitting EPS beneath a screed around pipes and services

Before ordering EPS for a screeded floor, establish the finished level and mark pipe runs, sleeves and crossings on a plan. Allow for insulation, screed, heating and the floor finish, checking clearances at thresholds, stairs and doors. The insulation must have stable support over services too. A thin sheet cannot make up for a wide void, and thinning the screed locally is not a solution to a high pipe. Test services before covering them and photograph their routes against fixed reference points.

By |2026-11-12T17:47:36+01:0012 November 2026|PIR boards and insulation|Comments Off on Fitting EPS beneath a screed around pipes and services