Insulating a loft from outside with swissporPIR Alu

PIR insulation

At a glance

Replacing the covering on a house with a finished loft gives access to the rafters from outside. An over-rafter layer of swissporPIR Alu preserves headroom but raises the roof surface. Before ordering boards, inspect the eaves, chimney and roof windows, where levels, insulation continuity and drainage all have to work together. This guide covers the eaves section, counterbatten fixings and the distinction between keeping indoor air out of the roof and draining rain towards the gutter.

Insulation core and facing of swissporPIR Alu

Survey the existing roof

Record which layers on the room side of the rafters will remain. The new board’s gas-tight facing will not repair a joint that lets loft air into the structure.

Join roof and wall insulation at the eaves

swisspor declares a conductivity of 0.022 W/(m·K) for this board. On the section, trace the specified insulation thickness from the slope to the wall insulation.

Measure the space at the wall plate beneath the eaves. If the layout leaves an uninsulated strip, revise the detail rather than shortening the last board on site.

Find sound timber for the counterbattens

Once the rafters are exposed, check timber condition and bearing levels. Over-rafter insulation is not a means of straightening a sagging roof.

Mark the rafter centrelines before covering them. The fixing drawing should specify screw lengths and positions for anchoring the counterbattens to the structure.

Trace rainwater and indoor air separately

Follow the underlay down the slope. At a roof window the water needs a route around the opening and back towards the eaves.

On a separate sketch, trace the internal airtight layer. Its junction with the window reveal is a different detail from the drainage channel above the window.

Summer heat and the chimney junction

Include glazed area, shading and ventilation when assessing summer overheating. PIR thickness alone cannot predict a bedroom’s temperature on a hot evening.

Check the clearances and permitted junction for the actual chimney system. Do not assume the ordinary roof build-up can continue right up to a hot component.

Allow for changes around the roof

Raising the roof may affect chimney flashings, gutter position and roof window connections. List these works separately from the area of boards.

Agree who will weatherproof the open roof overnight. This is a distinct item when the loft below remains furnished during the work.

Before ordering the last row

Check a sample of the complete new build-up at the eaves, not just a piece of PIR. It shows where the covering will end relative to the gutter and how the wall junction can be closed.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide