Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

Which records should you keep for an integrated photovoltaic roof?

Roofing and energy

At a glance

Keep the roofing and electrical records together once the photovoltaic roof is complete. The most useful documents describe what was actually installed: the module layout, cable routes, handover and test reports, and the applicable warranties. During a repair a technician needs to locate the faulty panel, identify its connections and know how to make the covering weatherproof again. A short, up-to-date file can be more valuable than a detailed design that was never revised after installation. These records will also help a new contractor or owner assess the system before extending it or replacing components.

Building with a graphite roof and integrated solar panels

Why do records add value to the roof?

Reconstructing the installation from scratch delays diagnosis and makes it harder to establish who carried out each part of the work.

The file is more than an attachment to an invoice. It helps keep the system in service for years, especially when the contractor or owner changes. Future work should not depend on the original installer remembering what was done on site.

Which as-built drawings are useful?

Keep a roof plan showing active modules, passive sections, openings and important junctions as installed. Include changes made on site. Use module identifiers that match the monitoring display so a fault message can be traced to the right place on the slope.

Include the electrical diagram and cable routes, marking where cables pass through the building fabric and where equipment is located. Several coordinated sheets are fine. A preliminary design without the site changes is no substitute for the final record.

Which reports and photographs should you retain?

Keep the results of the required tests and the handover records for the electrical and roofing work. Record the scope, date and person responsible and obtain confirmation of any remedial work. A known starting condition makes later faults easier to interpret.

Label photographs of work that will be concealed with the location shown. Pictures of layers, penetrations, roof windows, chimneys and cable routes can explain a detail that will be difficult to see later. They complement drawings and test reports without replacing them.

How should product details and warranties be filed?

Keep data sheets for the exact panels, inverter and other equipment installed. Record substitutions, the coating and the materials used for flashings. These details help a repair team select a compatible replacement.

Separate the warranty terms by scope. Module output, installation workmanship and the roof finish may have different cover. Note required inspections, the claims procedure and the responsible party. A short contact list saves the owner searching several documents when a fault occurs.

What should be added during the life of the roof?

Log inspections, repairs and alterations. When a part is replaced, note the model, date and position. Update the diagram if cables are rerouted or equipment is added. Without those changes the drawings soon stop describing the system a technician will find.

Archive basic generation figures and important alerts. You do not need every instantaneous reading: long-term performance and dates of unusual events help distinguish a gradual change from a sudden fault and make for a clearer service request.

How can you make the file useful to the owner?

Group the material under design, handover, products, warranties and service history. Keep a digital copy and make key documents easy to find. Store monitoring credentials securely and provide a recovery method. Do not circulate passwords with publicly shared information about the house.

When handing over the building, explain normal operation and whom to contact for service. Complete records make an integrated solar roof easier to assess and maintain, so the next owner can look after both the covering and the power system.

Test the records by picking one module identifier on the monitoring screen and finding it on the roof plan. Resolve any mismatch with the installer before filing the documents.

Companies and brands in roof-integrated photovoltaics include ML System, 3S Swiss Solar Solutions, SoliTek, SunRoof, SolRoof, GAF Energy, Electrotile, Autarq, Wienerberger Wevolt and MDM NT (MyRoof).

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide