Thermano Deck on a flat roof: decisions before installation
PIR insulation
Before ordering Thermano Deck, establish how the roof will drain, which deck supports it and how the waterproofing will be fixed. The PIR board has gas-tight multilayer facings containing aluminium on both sides. It provides thermal insulation in a conventional flat roof; it is neither the roof covering nor a substitute for a detailed vapour-control layer. On trapezoidal steel decking, agree on the direction of the boards, cover width of the chosen edge profile and support at parapets. Show access to outlets and seals at penetrations before signing off the quantities.

Specify the layers, not just the board
Label the deck, vapour control, board, fixing and covering on a typical Thermano Deck section. Repeat at the junction between work stages so the crews know where each section and responsibility ends.
Choose the roof build-up before settling on board thickness. Agree on substrate, covering, parapet and drainage. Name BASIC, TOP or MASTER in the order to avoid recalculating quantities on site.
Lay out the selected edge profile
BASIC, TOP and MASTER are Thermano Deck edge options. The standard board’s 1,200 × 2,400 mm dimensions are external; use the actual cover dimensions for the option ordered.
Mark the rib direction and run the boards’ long edges across it. If TOP or MASTER is selected, set out successive rows using that profile’s cover size. Accumulated cover differences affect the final cut and its support at the parapet.
Read the thermal values across the thickness boundary
Read Deck λD by thickness: 0.023 W/(m·K) for 30–90 mm and 0.022 W/(m·K) for 100–200 mm. Do not assign the better value to the thinner variant.
Moving from 90 to 100 mm changes both thickness and conductivity in the calculation. Check both declared RD values. Assess the change for the roof only after including adjacent layers and fixings.
Check the deck before closing each section
Before laying the first board inspect the level, dry deck and separate vapour control layer. On trapezoidal steel verify that the board’s long dimension crosses the ribs at right angles.
If work stops mid-roof, protect the edge against rain running under installed insulation. The silver facing does not close the vapour-control junction. Recheck the temporary junction, boards and substrate before resuming and covering them.
Read loads and fire class at the specified thickness
At 10% deformation the declared minimum is 150 kPa for Deck at 30–160 mm and 120 kPa at 170–200 mm. The product’s reaction-to-fire class E is a separate property.
Replacing 160 with 170 mm does not improve every property: the declared CS level falls at this boundary. Recheck plant-foot pressure, its distribution and design compatibility when increasing thickness.
Ordering and acceptance
State substrate, covering and board edge in the order. Where PV is planned, agree load transfer and array fixings before the roof is closed.
Separate field area from outlets, parapets and equipment bases in the estimate. Assign fixing materials, flashings and responsibility to each. Compare equal numbers of completed details and boards by cover area, not just insulation square metres.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
More from the building guide
Two insulation quotations may cover the same part of a house while including different quantities and delivery arrangements. When comparing PIR, EPS,…
Utherm Roof BM has two different surfaces: bituminised glass fleece on one side and mineralised glass fleece on the other. When ordering…
PIR insulation is not invariably half as thick as EPS. The equivalent thickness depends on the thermal conductivity of both chosen products.…
If a roofing quote says only “BauderPIR 100 mm”, ask whether the product is M or MF and request an edge drawing.…
Ask what will be finished when the crew leaves. A square metre of PIR does not include substrate preparation, fixings or sealed…
After insulating a home, check both energy consumption and the cost of purchasing it. A lower bill alone does not prove that…
Select PIR roof panels for livestock buildings, stores or wash-down rooms according to conditions on both sides of the roof. Core thickness…
Before boarding the loft, it is worth drawing the finished slope together with the insulation, framing, cables and lining. Only such a…