EFYOS BLUE SMART A on a small roof: drawing the falls around a rooflight

PIR insulation

At a glance

When a puddle forms beside a rooflight, survey the levels between its kerb and the outlet first. They show whether the kerb obstructs drainage and where an EFYOS BLUE SMART A tapered board is needed. On a small roof a few centimetres can move the low point. Draw flow arrows, the outlet level, valley line and transitions to flat insulation. The roofer can then schedule pieces in laying order and check that the waterproofing can terminate at the required height on the kerb.

Blue SOPREMA EFYOS BLUE SMART A tapered PIR boards with straight edges

What to settle before delivery

Use one survey datum. Record the deck and proposed finished membrane levels at each outlet. The difference gives the space available for the base insulation and tapered board.

Identifying the board and its declared properties

SMART A has aluminium facings, square edges and a 1200 × 1200 mm format. The nominal 2.08% system lists λ 0.022 W/(m·K), CS(10)150 and reaction-to-fire class E. Assign each piece on the order a position on the plan.

Using a worked example

Across 1.20 m a 2.08% gradient rises by 1.20 × 0.0208 m, about 25 mm. Add that rise to the surveyed starting level to find the actual level at the far end.

Trace the flow on each side of the rooflight to its meeting point. Check the valley level where the two fields meet. A step there can trap water even when the adjacent boards have the correct slope.

Comparing the available options

Compare directing water to the existing outlet with relocating it. For relocation, establish the pipe route and whether a new penetration through the deck is feasible.

Inspection before covering

Before the membrane is laid, check board numbers and the direction of increasing thickness. Place a straightedge across the valley and check the run to the outlet against the drawing.

What the quote should cover

Request a schedule of tapered pieces by reference, outlet components and flat underboards. Include valley formation and the rooflight flashing so the most demanding part of the drainage path is priced.

Records to keep after completion

Keep the as-built falls plan, surveyed levels and a photograph before covering. If ponding recurs, its location can be compared with the actual arrangement of tapered boards.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Budowlanka.org — map

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

More from the building guide