IKO enertherm MG and foil-faced PIR under a synthetic roof membrane

If a roof quote replaces foil-faced PIR with IKO enertherm MG, ask for a revised section and membrane fixing instructions. MG has coated glass fleece on both faces. The change of facing affects the connection to the covering. The thermal calculation also changes because MG conductivity varies with thickness. Compare the quotations once both state the thickness, declared RD and method of securing each layer. Pay particular attention to details where thicker insulation leaves less height for the membrane upstand.

By |2026-11-12T16:23:32+01:0012 November 2026|PIR boards and insulation|Comments Off on IKO enertherm MG and foil-faced PIR under a synthetic roof membrane

Ordering IKO enertherm ALU TAP tapered roof boards by drainage area

Schedule IKO enertherm ALU TAP from the outlet towards the high edge of each drainage area. Two tapers can have the same gradient but different starting heights. Mark the sequence, drainage arrows and thicknesses where successive rows meet. A change in sequence can create a step in the water path even when the pallet holds the right number of boards. At delivery, match pack references to the layout. At inspection, check levels on both sides of the junction between drainage areas.

By |2026-11-12T16:23:31+01:0012 November 2026|PIR boards and insulation|Comments Off on Ordering IKO enertherm ALU TAP tapered roof boards by drainage area

IKO enertherm KR ALU beneath underfloor heating: checks before screeding

IKO enertherm KR ALU forms an insulating layer below the heated screed. The printed grid helps the installer follow the pipe layout on the heating drawings. Before ordering, check the depth available at the door for insulation, pipes, screed and floor finish. Compare both sides of the threshold, particularly where tile meets timber. Before screeding, the board support, movement joints and actual pipe routes are still visible. Once the screed has set, reaching these details means opening the floor.

By |2026-11-12T16:23:30+01:0012 November 2026|PIR boards and insulation|Comments Off on IKO enertherm KR ALU beneath underfloor heating: checks before screeding

IKO enertherm ALU TG: planning tongue-and-groove joints and cut edges

On IKO enertherm ALU TG boards, the tongue of one board fits into the groove of the next. Along a straight run it is easy to see whether the edges engage. At a wall, column or recess, cutting removes part of the profile. Before ordering, draw the first and last courses and mark which edges will retain their factory profile. Include the support and finish for cut pieces. The drawing gives a basis for estimating quantities and shows where the installer must maintain continuity in the next layer.

By |2026-11-12T16:23:28+01:0012 November 2026|PIR boards and insulation|Comments Off on IKO enertherm ALU TG: planning tongue-and-groove joints and cut edges

Choosing IKO enertherm ALU for a house: board designation and assembly details

When choosing IKO enertherm ALU for a house, first establish where the board sits in the assembly and which layers protect it. The aluminium facing helps identify the product family, but the full label identifies the variant being ordered. Use the figures for the chosen thickness in thermal calculations. For reaction to fire, read the classification conditions, particularly the substrate and method of installation. A rating for a specified assembly on steel decking cannot be transferred to a timber assembly simply because the insulation boards look similar.

By |2026-11-12T16:04:53+01:0012 November 2026|PIR boards and insulation|Comments Off on Choosing IKO enertherm ALU for a house: board designation and assembly details

Roof equipment on BauderPIR FA: what to establish about its supports

Before installing equipment above BauderPIR FA, ask the designer to trace the load from each foot to the supporting structure. The share carried by each support depends on the machine’s centre of gravity. Pressure depends on the actual contact area, which can be smaller than the outline of the foot on an uneven surface. Permanent loads also raise questions about deformation over time, the condition of the waterproofing and drainage around the equipment. Suitability depends on the full roof build-up and the operating conditions of the machine.

By |2026-11-12T16:04:52+01:0012 November 2026|PIR boards and insulation|Comments Off on Roof equipment on BauderPIR FA: what to establish about its supports

Correcting roof falls with BauderPIR T: from survey to cutting plan

When refurbishing a roof with standing water, survey the deck before ordering BauderPIR T tapered boards. Record levels at the outlets, on both sides of each valley and along the parapets. These levels determine the direction in which the insulation thickens and where adjacent roof areas drain into a common valley. Order the boards by the references on the layout. Each reference needs a gradient, starting thickness and quantity. A gradient alone does not establish the finished level at the outlet.

By |2026-11-12T16:04:51+01:0012 November 2026|PIR boards and insulation|Comments Off on Correcting roof falls with BauderPIR T: from survey to cutting plan

BauderPIR M and MF: how to read a roof insulation quote

If a roofing quote says only “BauderPIR 100 mm”, ask whether the product is M or MF and request an edge drawing. Both boards have mineral fleece facings on each side, but the edge profile affects the joint layout. For a bonded roof covering, the fleece, adhesive and waterproofing must also suit the proposed system. Before comparing prices, look up the declared thermal resistance for the quoted thickness. Check the roof covering instructions for the required surface preparation and bonding method.

By |2026-11-12T16:04:49+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR M and MF: how to read a roof insulation quote

BauderPIR FA-TE beneath a terrace: door thresholds, pedestal loads and waterproofing

To assess BauderPIR FA-TE for a terrace above a heated room, draw a section from the door threshold to the outlet. Allow space for insulation, waterproofing, pedestals and paving. Water running beneath the paving needs a clear path to the outlet, including at the door. Mark the foot of the nearest pedestal on the same drawing. Its position affects how the waterproofing must be protected. Before ordering, establish the threshold and outlet levels, the pedestal detail and the effective cover dimensions of the FA-TE boards being supplied.

By |2026-11-12T16:04:48+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR FA-TE beneath a terrace: door thresholds, pedestal loads and waterproofing

BauderPIR FA on a house roof: converting board sizes into an order

A large BauderPIR FA board has two relevant dimensions. Transport and storage use the overall 2400 × 1200 mm size. Set out roof rows using the installed module of 2385 × 1185 mm, which allows for the 15 mm rebate. Whole boards are easy to count in a rectangular field, but the last row at a parapet and cuts at a roof hatch can change the order. Draw these areas and check the route from unloading point to roof before ordering pallets.

By |2026-11-12T16:04:47+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR FA on a house roof: converting board sizes into an order