A SOPREMA PIR roof at a rooflight: who completes each layer?
Three layers meet a rooflight kerb. EFYOS BLUE A insulation must reach it as shown on the thermal detail. The vapour control layer needs a connection on the side specified by the designer, while the waterproofing must return rainwater to the roof surface. If different trades install the layers, mark the trade and inspection point for each connection on a single section. Inspect during installation. Once the final membrane is in place, two of the three connections are generally concealed.