Panels · Sheet metal · Insulation · Accessories

PIR insulation boards: what to check before insulating

Rigid PIR insulation boards can be used in suitably designed roofs, walls and floors. Suitability depends on more than thickness and foam type: the facing, declared performance and surrounding layers all matter. A thin foil facing is not a sandwich panel's metal skin, and a low thermal conductivity does not guarantee the performance of the whole building. Establish thermal requirements, loads, fixing method and moisture protection before ordering. This guide shows how to read the data sheet, compare pack quantities and prepare a quote request. The examples apply only to the specific variants named.

By |2026-11-12T18:09:48+01:0012 November 2026|Construction advice|Comments Off on PIR insulation boards: what to check before insulating

PIR sandwich panels: why walls and roofs need different systems

PIR sandwich panels form a building envelope from metal facings and an insulating core. Wall and roof panels differ in profile, joints and permitted uses. Choosing between them means checking thermal requirements, loads, support spacing, fire performance and exposure in service. Thickness alone does not determine load capacity, and a photograph of a joint cannot replace the manufacturer's instructions. This guide explains what to specify when comparing systems for an industrial building, garage or warehouse, and how to distinguish a metal-faced sandwich panel from a PIR insulation board with thin foil facings.

By |2026-11-12T18:09:45+01:0012 November 2026|Construction advice|Comments Off on PIR sandwich panels: why walls and roofs need different systems

Planning building services before closing SIP walls

In a SIP house the structural wall and part of the insulation arrive together. This makes erection convenient but changes how services must be planned. Agree cable routes, pipework and ventilation openings before altering the prefabricated panels. A well-designed service void helps keep the polyurethane core continuous, limits penetrations and makes future alterations easier. SIP means structural insulated panel: facings and insulating core are bonded together. In a panel with OSB faces and PUR or PIR foam, the layers can act together to carry loads. Cutting or weakening them is a structural matter, not an ordinary adjustment to the finish.

By |2026-11-12T18:09:41+01:0012 November 2026|PIR boards and insulation|Comments Off on Planning building services before closing SIP walls

Delivering and storing SIPs on site

Schedule delivery of structural insulated panels (SIPs) for a time when the site is ready. Panels need suitable unloading equipment, level supports and protection from rain. Planning the laydown area reduces repeated handling and keeps panels accessible in erection order. This protects OSB faces, edges and the bond to the polyurethane core. Before dispatch, establish the vehicle type and largest panel dimensions. Check entrance width, turning space and the bearing capacity of the standing area. Overhead wires, trees and other obstructions can limit the unloading equipment's working space even when the truck itself can get in.

By |2026-11-12T18:09:40+01:0012 November 2026|PIR boards and insulation|Comments Off on Delivering and storing SIPs on site

SIP openings and joints: decisions to make before manufacture

A factory-cut window opening saves site work only if the window size and position are agreed in time. Cutting an opening changes how a structural insulated panel carries load, and its edges must provide for fixing and sealing the frame. Corners and panel joints need the same attention: they bring structure, insulation and rain protection together. A SIP consists of facings bonded to an insulating core. In panels with OSB skins and a PUR or PIR core, the skins and foam act together. The fabrication drawings need to show how that assembly works around every opening.

By |2026-11-12T18:09:39+01:0012 November 2026|PIR boards and insulation|Comments Off on SIP openings and joints: decisions to make before manufacture

Preparing the base for SIP walls: checks before installation

Check the base before the first structural insulated panel (SIP) arrives. Its position and level determine how the remaining walls, openings and corners line up. A polyurethane core and accurate factory dimensions are useful only if the panels fit the structure actually built. Complete the survey and agree any corrections before the delivery and installation crew arrive. A SIP building may stand on several types of foundation or a designed floor structure. The choice depends on the design and ground conditions. Lightweight walls still require checks on settlement, soil bearing capacity and the forces transferred to the base.

By |2026-11-12T18:09:38+01:0012 November 2026|PIR boards and insulation|Comments Off on Preparing the base for SIP walls: checks before installation

What should a SIP house panel kit include?

A SIP house kit may consist of uncut panels, numbered pieces machined to the design, or a supply-and-install package. Before comparing prices, ask for panel layout drawings and an itemised list covering core, facings, openings, edge machining, connectors and seals. Establish who handles transport, unloading, erection and finishes. SIP stands for structural insulated panel, but the name alone does not establish a specific product’s load-bearing role. For polyurethane insulation, confirm whether the core is PUR or PIR and how the design uses the panel.

By |2026-11-12T17:47:42+01:0012 November 2026|PIR boards and insulation|Comments Off on What should a SIP house panel kit include?

Taking delivery of swissporPIR Alu on a house build

Start the delivery check before unpacking the pallet. Match the swissporPIR Alu labels to the order, count packs by thickness and record visible damage against specific packs. Then inspect boards, particularly corners and edges hidden by the wrapping. Separate questionable material from stock ready to lay. This guide takes you from the delivery note to another inspection after rain and explains why choosing a storage position is part of acceptance, especially when the pallet is to go onto a roof.

By |2026-11-12T17:03:48+01:0012 November 2026|PIR boards and insulation|Comments Off on Taking delivery of swissporPIR Alu on a house build

Insulating a loft from outside with swissporPIR Alu

Replacing the covering on a house with a finished loft gives access to the rafters from outside. An over-rafter layer of swissporPIR Alu preserves headroom but raises the roof surface. Before ordering boards, inspect the eaves, chimney and roof windows, where levels, insulation continuity and drainage all have to work together. This guide covers the eaves section, counterbatten fixings and the distinction between keeping indoor air out of the roof and draining rain towards the gutter.

By |2026-11-12T17:03:46+01:0012 November 2026|PIR boards and insulation|Comments Off on Insulating a loft from outside with swissporPIR Alu

A flat roof with swissporPIR Alu: checks before the covering goes on

Before installing swissporPIR Alu on a flat roof, establish the deck, falls and fixing method. The manufacturer requires mechanical fixings even where adhesive is used. Draw the first row at the parapet and the last row at the outlet in detail: the regular runs end here and several layers meet. Identify what supports the board, where water will drain and how the waterproofing joins the outlet flange. These details show whether the quotation covers a complete roof.

By |2026-11-12T17:03:45+01:0012 November 2026|PIR boards and insulation|Comments Off on A flat roof with swissporPIR Alu: checks before the covering goes on
Back to top