IKO enertherm ALU TG: planning tongue-and-groove joints and cut edges

On IKO enertherm ALU TG boards, the tongue of one board fits into the groove of the next. Along a straight run it is easy to see whether the edges engage. At a wall, column or recess, cutting removes part of the profile. Before ordering, draw the first and last courses and mark which edges will retain their factory profile. Include the support and finish for cut pieces. The drawing gives a basis for estimating quantities and shows where the installer must maintain continuity in the next layer.

By |2026-11-12T16:23:28+01:0012 November 2026|PIR boards and insulation|Comments Off on IKO enertherm ALU TG: planning tongue-and-groove joints and cut edges

Choosing IKO enertherm ALU for a house: board designation and assembly details

When choosing IKO enertherm ALU for a house, first establish where the board sits in the assembly and which layers protect it. The aluminium facing helps identify the product family, but the full label identifies the variant being ordered. Use the figures for the chosen thickness in thermal calculations. For reaction to fire, read the classification conditions, particularly the substrate and method of installation. A rating for a specified assembly on steel decking cannot be transferred to a timber assembly simply because the insulation boards look similar.

By |2026-11-12T16:04:53+01:0012 November 2026|PIR boards and insulation|Comments Off on Choosing IKO enertherm ALU for a house: board designation and assembly details

Roof equipment on BauderPIR FA: what to establish about its supports

Before installing equipment above BauderPIR FA, ask the designer to trace the load from each foot to the supporting structure. The share carried by each support depends on the machine’s centre of gravity. Pressure depends on the actual contact area, which can be smaller than the outline of the foot on an uneven surface. Permanent loads also raise questions about deformation over time, the condition of the waterproofing and drainage around the equipment. Suitability depends on the full roof build-up and the operating conditions of the machine.

By |2026-11-12T16:04:52+01:0012 November 2026|PIR boards and insulation|Comments Off on Roof equipment on BauderPIR FA: what to establish about its supports

Correcting roof falls with BauderPIR T: from survey to cutting plan

When refurbishing a roof with standing water, survey the deck before ordering BauderPIR T tapered boards. Record levels at the outlets, on both sides of each valley and along the parapets. These levels determine the direction in which the insulation thickens and where adjacent roof areas drain into a common valley. Order the boards by the references on the layout. Each reference needs a gradient, starting thickness and quantity. A gradient alone does not establish the finished level at the outlet.

By |2026-11-12T16:04:51+01:0012 November 2026|PIR boards and insulation|Comments Off on Correcting roof falls with BauderPIR T: from survey to cutting plan

BauderPIR M and MF: how to read a roof insulation quote

If a roofing quote says only “BauderPIR 100 mm”, ask whether the product is M or MF and request an edge drawing. Both boards have mineral fleece facings on each side, but the edge profile affects the joint layout. For a bonded roof covering, the fleece, adhesive and waterproofing must also suit the proposed system. Before comparing prices, look up the declared thermal resistance for the quoted thickness. Check the roof covering instructions for the required surface preparation and bonding method.

By |2026-11-12T16:04:49+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR M and MF: how to read a roof insulation quote

BauderPIR FA-TE beneath a terrace: door thresholds, pedestal loads and waterproofing

To assess BauderPIR FA-TE for a terrace above a heated room, draw a section from the door threshold to the outlet. Allow space for insulation, waterproofing, pedestals and paving. Water running beneath the paving needs a clear path to the outlet, including at the door. Mark the foot of the nearest pedestal on the same drawing. Its position affects how the waterproofing must be protected. Before ordering, establish the threshold and outlet levels, the pedestal detail and the effective cover dimensions of the FA-TE boards being supplied.

By |2026-11-12T16:04:48+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR FA-TE beneath a terrace: door thresholds, pedestal loads and waterproofing

BauderPIR FA on a house roof: converting board sizes into an order

A large BauderPIR FA board has two relevant dimensions. Transport and storage use the overall 2400 × 1200 mm size. Set out roof rows using the installed module of 2385 × 1185 mm, which allows for the 15 mm rebate. Whole boards are easy to count in a rectangular field, but the last row at a parapet and cuts at a roof hatch can change the order. Draw these areas and check the route from unloading point to roof before ordering pallets.

By |2026-11-12T16:04:47+01:0012 November 2026|PIR boards and insulation|Comments Off on BauderPIR FA on a house roof: converting board sizes into an order

A SOPREMA PIR roof at a rooflight: who completes each layer?

Three layers meet a rooflight kerb. EFYOS BLUE A insulation must reach it as shown on the thermal detail. The vapour control layer needs a connection on the side specified by the designer, while the waterproofing must return rainwater to the roof surface. If different trades install the layers, mark the trade and inspection point for each connection on a single section. Inspect during installation. Once the final membrane is in place, two of the three connections are generally concealed.

By |2026-11-12T16:04:45+01:0012 November 2026|PIR boards and insulation|Comments Off on A SOPREMA PIR roof at a rooflight: who completes each layer?

EFIGREEN ITE on an external wall: will the existing sill still fit?

To decide whether an existing sill will work with SOPREMA EFIGREEN ITE, measure its projection from the future façade face. On a window section mark the masonry, PIR, support frame, space behind the cladding, cladding thickness and frame position. Include the sill ends. The section shows how much insulation fits at the reveal and where rain drains clear of the wall. Select board thickness alongside this window detail. Replacing a short sill later can involve removing part of the new cladding.

By |2026-11-12T16:04:44+01:0012 November 2026|PIR boards and insulation|Comments Off on EFIGREEN ITE on an external wall: will the existing sill still fit?

EFIGREEN ALU+ or ALU+ XL for a roof with service penetrations?

Use the same roof drawing to prepare two cutting layouts for EFIGREEN ALU+ and ALU+ XL. Larger sheets reduce the joint count on a clear deck. Between vent pipes and equipment bases, smaller 600 × 600 mm boards may allow more pieces to be laid whole. The result depends on spacing, laying direction and the size of the specific XL version. Check the thickness and product designation on both quotes, then compare quantities, waste and work at penetrations for each layout.

By |2026-11-12T16:04:43+01:0012 November 2026|PIR boards and insulation|Comments Off on EFIGREEN ALU+ or ALU+ XL for a roof with service penetrations?