IDELCO α-therm WALL in a cavity wall: detailing the window sill

A single window reveals much about how IDELCO α-therm WALL fits into a cavity wall. A section below the sill shows where the insulation ends, how much space remains behind the outer leaf and where rain entering through façade joints will drain. The reveal also needs cuts and allowances for wall ties. Ask the crew to show you this junction before building further courses of facing masonry. At that stage you can still see board contact, tongue-and-groove joints and whether the designed cavity is clear.

By |2026-11-12T16:44:39+01:0012 November 2026|PIR boards and insulation|Comments Off on IDELCO α-therm WALL in a cavity wall: detailing the window sill

IDELCO α-therm ROOF: choosing a fixing method for a domestic flat roof

When specifying IDELCO α-therm ROOF, identify what secures the insulation to the deck and what holds the waterproofing in place. These two interfaces can require different materials. On a bonded roof, both contact surfaces at each joint matter. Ballast adds weight, while mechanical fixing depends on the deck and anchorage. State the selected method alongside the roof section so the full cost can be calculated. It also allows inspection before the first covering layer conceals fasteners or bonded areas.

By |2026-11-12T16:23:39+01:0012 November 2026|PIR boards and insulation|Comments Off on IDELCO α-therm ROOF: choosing a fixing method for a domestic flat roof

Utherm Wall LE or Wall K Gyp: cavity insulation and internal lining

Before choosing a UNILIN wall board, mark its position on the section. Utherm Wall LE insulates a cavity wall. Wall K Gyp combines insulation with plasterboard on the room side. For cavity work, detail the wall ties, cavity and drainage at the foot of the wall. For internal lining, establish the existing wall condition, fixing method and joint finish. When comparing quotations, identify whether the thickness refers to PIR alone or the full composite. This dimension affects the depth of window and door reveals.

By |2026-11-12T16:23:37+01:0012 November 2026|PIR boards and insulation|Comments Off on Utherm Wall LE or Wall K Gyp: cavity insulation and internal lining

Utherm Roof BM on a flat roof: which facing meets the waterproofing?

Utherm Roof BM has two different surfaces: bituminised glass fleece on one side and mineralised glass fleece on the other. When ordering for a flat roof, request a section identifying both faces and the first waterproofing layer. This lets the roofer check compatibility and plan the installation sequence. For thickness selection, read the corresponding row in the BM sheet because conductivity varies with thickness. A comparison with foil-faced insulation therefore needs both the thermal resistance and the proposed connection to the roof system.

By |2026-11-12T16:23:36+01:0012 November 2026|PIR boards and insulation|Comments Off on Utherm Roof BM on a flat roof: which facing meets the waterproofing?

Utherm Floor LE under a domestic screed: levels, services and finishes

Mark the finished floor level in each room before laying Utherm Floor LE. Work down from that line through tile or timber, adhesive, screed, services and insulation. Where floor finishes differ, one insulation thickness does not guarantee a level doorway. Plot any services running across the slab and establish how each piece of rigid insulation will be supported. A section through the most congested location, such as a service crossing near a wall, will define the preparation needed before delivery.

By |2026-11-12T16:23:35+01:0012 November 2026|PIR boards and insulation|Comments Off on Utherm Floor LE under a domestic screed: levels, services and finishes

Utherm Sarking LE and LE Plus: detailing the underlay above the rafters

When reroofing and insulating an attic from outside, compare how the underlay will be formed. Utherm Sarking LE Plus has an underlay bonded to the board at the factory. With standard LE, plan that part of the build-up separately. Eaves, chimneys and roof windows can determine which option suits the roof because regular board courses stop at these details. Ask the roofer to trace water on the underlay from window to eaves and show the laps. The quotation can then include the boards and the accessories the junctions require.

By |2026-11-12T16:23:34+01:0012 November 2026|PIR boards and insulation|Comments Off on Utherm Sarking LE and LE Plus: detailing the underlay above the rafters

Utherm Roof LE for a house: checking height, fixings and board sizes

Start a Utherm Roof LE layout at the point where the build-up has least room, often a low access threshold or rooflight kerb. The finished roof level depends on the fall and the layers above the board as well as the insulation thickness. Mark the upper surface of the waterproofing and its termination level on the upright face. Before ordering, this will show whether the selected thickness leaves space for a watertight junction and which flashings belong in the price.

By |2026-11-12T16:23:33+01:0012 November 2026|PIR boards and insulation|Comments Off on Utherm Roof LE for a house: checking height, fixings and board sizes

IKO enertherm MG and foil-faced PIR under a synthetic roof membrane

If a roof quote replaces foil-faced PIR with IKO enertherm MG, ask for a revised section and membrane fixing instructions. MG has coated glass fleece on both faces. The change of facing affects the connection to the covering. The thermal calculation also changes because MG conductivity varies with thickness. Compare the quotations once both state the thickness, declared RD and method of securing each layer. Pay particular attention to details where thicker insulation leaves less height for the membrane upstand.

By |2026-11-12T16:23:32+01:0012 November 2026|PIR boards and insulation|Comments Off on IKO enertherm MG and foil-faced PIR under a synthetic roof membrane

Ordering IKO enertherm ALU TAP tapered roof boards by drainage area

Schedule IKO enertherm ALU TAP from the outlet towards the high edge of each drainage area. Two tapers can have the same gradient but different starting heights. Mark the sequence, drainage arrows and thicknesses where successive rows meet. A change in sequence can create a step in the water path even when the pallet holds the right number of boards. At delivery, match pack references to the layout. At inspection, check levels on both sides of the junction between drainage areas.

By |2026-11-12T16:23:31+01:0012 November 2026|PIR boards and insulation|Comments Off on Ordering IKO enertherm ALU TAP tapered roof boards by drainage area

IKO enertherm KR ALU beneath underfloor heating: checks before screeding

IKO enertherm KR ALU forms an insulating layer below the heated screed. The printed grid helps the installer follow the pipe layout on the heating drawings. Before ordering, check the depth available at the door for insulation, pipes, screed and floor finish. Compare both sides of the threshold, particularly where tile meets timber. Before screeding, the board support, movement joints and actual pipe routes are still visible. Once the screed has set, reaching these details means opening the floor.